Cement Rings

At Tier 1 Oil and Gas, client required custom tanks build to support a PNA Program in Western Australia. Due to the strict environmental requirements on site, there was no ability to dig pits to store excess cement. A solution was put forward in records time to support the project. 

Yabani project team developed custom-engineered tanks specifically for the project requirements. The tanks were drawn up and engineered with full RPQ sign-off. 

The tanks were manufactured locally in a ISO9001 approved factory. 


The equipment and supporting package were then handed over to the client. The rings were then rigged up on-site without any issues. 


The whole process from initial concept, design, manufacture and execution was completed in less than a month. 


The client was provided:

  • Engineered Drawings  
  • Plant Risk Assessments  
  • Standard Operating Procedures.


The Cement  Rings incorporated:

  • Safe handling and use 
  • Road transport risks 
  • Reduce time to rig up and down on site
  • Reduce the number of loads. 