ERM Group 
ERM Group 
  • Home
  • Services and Offerings
  • Current Rental Equipment
  • Case Study - Rings
  • Case Study - Frac Tanks
  • Case Study - Skel Trailer
  • Case Study -Electric Unit

Modern Electric Cement Unit

Client Challenge

Client Challenge

  Develop a cement unit engineered to meet strict noise performance standards (100dBA Sound Power), driving innovation while delivering a more environmentally friendly and operationally efficient solution with reduced greenhouse gas emissions. 

ERM Solution

Client Challenge

  Engineered and designed a customized modern electric cement unit that reducing meet the noise performance requirements with the ability to run off the rigs generators and power systems if required. 

Benefits to the Client

•Met noise targets allowing the client to cement in noise sensitive areas 24/7 reducing any down time.  •Ability to po

  Engineered and designed a customized modern electric cement unit that reducing meet the noise performance requirements with the ability to run off the rigs generators and power systems if required. 

Benefits to the Client

•Met noise targets allowing the client to cement in noise sensitive areas 24/7 reducing any down time.  •Ability to power from the clients electric rig if required. •Significant emissions reductions.  •Built with noise attention in mind reducing down time due to overheating issues.  •Reduce kilometers with road train configuration.  Real time data monitoring allowing client access to real time cementing data anywhere 

End Result

End Result

  Timeline & Execution

The design process was completed in record time, with an estimated delivery time of 7 months from concept to operational use.  

Outcome

Effective and quick solutions saved the client time and money, kept their operations compliant and efficient, and maintained their asset uptime. Modular system allowing for rapid chang

  Timeline & Execution

The design process was completed in record time, with an estimated delivery time of 7 months from concept to operational use.  

Outcome

Effective and quick solutions saved the client time and money, kept their operations compliant and efficient, and maintained their asset uptime. Modular system allowing for rapid change out in the event of any downtime.  First of its kind electric cement unit and bulker designed and built in Australia using local manufacturers and suppliers.  Hydraulic walkways, handrails and hose reel reducing manual handling risk on site plus allowing for rapid rig up.  

Copyright © 2025 ERM Group  - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept